google-site-verification: google20ea84000cf83c6c.html

www.fastelectrician.co.uk © | 2016 Call 02035982213

02035982213

Emergency Electrician London  ( 20% OFF ) “               Local  Electrician Covers Commercial , Retail, Office s Shops, Domestic Every Aspect Covered”

30-60 Minute Rapid Response

Share on Facebook Share on Twitter Share via e-mail Print Share on Delicious Share on Google Bookmarks Share on Digg Share on LiveJournal Share on Newsvine Share on Reddit Share on Stumble Upon

ELECTRICIANS LONDON

About Periodic Test Inspections


Periodic test inspections

Periodic inspection reports suitable for landlords and homeowners

we can offer a same day service to assist with urgent inspections, and to assist with the process of moving into a new home / moving new clients. All our engineers have the latest 17th Edition 2008 wiring regulations test and inspection certification, they also carry a fully calibrated test and tool kit. We can also contact any tenants or letting agents for access, collect keys from estate agents or arrange a suitable time at your convenience.

Our periodic test inspections include a full inspection and testing of the fixed wiring of a property including:


Any faults will be flagged up on page 2 of the report and listed with a priority rating between 1 and 4. These figures refer to the following status:


A quotation for any remedial works will be provided with the report along with the VAT receipt for the inspection. Reports can be me-mailed to multiple precipitants if required to assist the process of moving home or new tenants.

Fees for periodic inspections - Please contact us

We also provide special rates for landlords and letting agents of multiple properties.

Fact File for Periodic Testing

The 17th Edition Wiring Regulations BS7671 – 2008 is the latest edition of the IEE British Standard publications. Every electrician we employ has trained to the IEE regulations and attended refresher courses to bring their expertise up to the latest 2008 edition.

Our team of engineers have also a minimum of 5 years on-site experience to be able to work for us.

2391 – To carry out Periodic Electrical Inspections in the UK, the engineers require, alongside the BS7671, to have also passed a City and Guilds Level 3 certificate in inspection, testing and certification of electrical installations (2391). This training provides the engineer with the relevant information and procedures regarding an initial visual inspection, verification and certification. This includes collecting data of correct types of cable, fuses – MCBs etc, the presence and correct operation of an RCD trip switch to prevent harm to property and lives from fire and electric shock. The presence and correct size of earthing conductors into the property; to the mains gas and water supply; to any exposed metal parts that may need earth bonding.

The test includes an instrumental verification test using the following instruments:


A full test on the supply of your home/business to BS7671 IEE Wiring Regulations including fuse board, earthing arrangements, wiring, fixtures and fittings (i.me. lights, sockets, switches). Installation methods, loose connections etc.

The following tests are carried out:


The test involves testing circuits at the consumer unit and various points around the property and includes a visual inspection as well as an instrumental test. Also the supplies characteristics are tested to ensure a good earth and path of fault current is present. These tests are called Ze and PSC (Prospective Short Circuit). These tests verify a circuit has continued earth path to each fitting and that the RCD operates within the specified time and current. Please feel free to contact us for any further details as we can help with any technical questions you may have.

All The above fields must Be Completed Thankyou